top of page
Soft Drink Floor install
The existing Quarry tile floor had failed to the majority of the room and required a major upgrade. Having to install during production we managed to wall of the area and remove 70m3 of failed tile, screed and waterproofing membrane. After these substantial works were completed a new concrete screed was installed with a formed in drain with Stainless steel edging. Finally the floor was completed with the use of a 6 mm Resin Cement non slip floor. A major challenge to undertake but the end result a exceptionally heavy duty floor that will last for the foreseeable future.
Project type
Soft Drink Factory

01
Soft Drink Floor install

01
20180310_090700.jpg

02
20180306_101642.jpg

03
20180316_164856.jpg

04
20180317_102239.jpg

05
20180317_142846.jpg

06
20180419_163348.jpg

07
20180419_175008.jpg

08
20180505_173326.jpg

09
20180408_144702.jpg

10
20180510_112903.jpg

11
20180510_112903.jpg

12
20180510_113106.jpg

13
20180510_113044.jpg

14
20180510_112917.jpg

15
20180507_163153.jpg

16
20180510_112815_enhance.png
- 20180310_090700.jpg
- 20180306_101642.jpg
- 20180316_164856.jpg
- 20180317_102239.jpg
- 20180317_142846.jpg
- 20180419_163348.jpg
- 20180419_175008.jpg
- 20180505_173326.jpg
- 20180408_144702.jpg
- 20180510_112903.jpg
- 20180510_112903.jpg
- 20180510_113106.jpg
- 20180510_113044.jpg
- 20180510_112917.jpg
- 20180507_163153.jpg
- 20180510_112815_enhance.png
bottom of page